Cothran Home Building Process

New Home Building Process

The building process can be a little scary if you’ve never built a brand new home before, or in some cases if you have. Here at Cothran Homes, we like to make the home building process as very simple as possible. Our Building Process follows these steps below, ensuring that you’ll know what to expect along the way.

    1

    Design Selection

    After your new home purchase is official, you will meet with our designer to verify the selections you made and choose your enhancements, colors and finishes. We'll be obtaining permits.

      2

      A Proper Foundation

      The first stage of construction is prepping the homesite and getting it ready to build. Once the site is ready and permits are back, it is time to get the foundation or slab in. While we strive to get this done as quickly as possible, it is highly dependent on weather.

        3

        Framing

        Framing takes 10 to 20 days depending on the size and complexity of the home. It is important to stay off the construction site and out of the house at this phase for safety considerations.

          4

          Rough-Ins

          Once framing is complete, we do a framing checklist and make sure the home is ready for plumbing, HVAC and electrical rough-ins. Essentially all the stuff behind the walls. When the rough-ins are complete, the home is inspected once more. Then insulation and drywall are installed.

            5

            Carpentry

            After hanging and sanding of the drywall is finished, your cabinets will be set. The trim carpenter will set all doors and trim the house to specifications.

              6

              Painting

              It’s really starting to look like a home now, so let’s get some paint on the walls. Around this time we like to get the driveway poured as well.

                7

                Plumbing & HVAC

                The plumber, HVAC and electrical contractors return to finish up their installations. Plumbing will be installed, HVAC equipment and appliances are installed, lights are hung, and switches and outlets installed.

                  8

                  Flooring

                  Some flooring may be installed before now, and some may be installed after, depending on your selections.

                    9

                    Quality Inspection List

                    Your home is close to complete! Now we go through and make our quality control list to get it move-in ready.

                      10

                      Orientation

                      Once we get the home complete, we conduct our Home Owner Orientation. We will walk you through the home and review all systems with you, and go through any items that you would like addressed.

                        11

                        Time To Move In!

                        Your home is now ready to be closed and is ready for you to move-in.